It's the government bureaucracy, legal reviews, endless paperwork, re-submitting revised plans, the 6-12 month wait times for each government review step, begging in front of 5 different veto-power committees, overturning the instant NIMBY pushback via political campaigning, endless environment reviews of how it will affect the earthworm population in this specific area, the legal challenges to the result of the earthworm consideration review (that you had to pay to be done yourself in year 10 of planning), etc. required before even putting a shovel in the ground.
War has a way of cutting through bullshit.
Instead of the discussion being..."is every bureaucratic stakeholder perfectly satisfied with every single minor aspect of this bridge?"...the discussion becomes..."you can build it next week? cool, how about faster? Our sons are dying every day its not up."
The Russians built the Kerch bridge a few years ago and then the Ukraine destroyed its longest road span two weeks ago. If not for war, this bridge could work for a long time (whether it should is a different question).
There was already a Kerch bridge built during the previous war in 1944. Built at record speed, it was also destroyed at record speed, by the sea and wind, because they prioritised speed of building before robustness. Any half-competent review of the plans would have noticed that, but as the war has "cut through that bullshit", they built a very expensive bridge that didn't work and had to be demolished.
The Francis Scott Key bridge collapsed in 2024 when hit by a ship. Demolition starts next month. A replacement bridge is scheduled for 2030.
Replies (2)
The problem is absolutely not that we don't know how to build bridges.
Replies (1)
What happens when the bridges are made by us?
Replies (2)
Replies (1)
It's the government bureaucracy, legal reviews, endless paperwork, re-submitting revised plans, the 6-12 month wait times for each government review step, begging in front of 5 different veto-power committees, overturning the instant NIMBY pushback via political campaigning, endless environment reviews of how it will affect the earthworm population in this specific area, the legal challenges to the result of the earthworm consideration review (that you had to pay to be done yourself in year 10 of planning), etc. required before even putting a shovel in the ground.
War has a way of cutting through bullshit.
Instead of the discussion being..."is every bureaucratic stakeholder perfectly satisfied with every single minor aspect of this bridge?"...the discussion becomes..."you can build it next week? cool, how about faster? Our sons are dying every day its not up."
Replies (1)
The Russians built the Kerch bridge a few years ago and then the Ukraine destroyed its longest road span two weeks ago. If not for war, this bridge could work for a long time (whether it should is a different question).
There was already a Kerch bridge built during the previous war in 1944. Built at record speed, it was also destroyed at record speed, by the sea and wind, because they prioritised speed of building before robustness. Any half-competent review of the plans would have noticed that, but as the war has "cut through that bullshit", they built a very expensive bridge that didn't work and had to be demolished.
Continue this thread (1 replies) →