  1. A pretty sizeable chunk of the white collar economy is just project managers estimating the relative difficulty between two products, and attaching timelines to that estimate, and then updating those estimates as the project progresses. Humans are pretty good at that, and our error bars are usually narrow (in the grand scheme of things).
    Replies (6)
    1. > Humans are pretty good at that

      LMAO, humans are absolutely terrible at that, which is why project estimates are basically never correct.

      Replies (2)
      1. They are consistently and predictably not correct which is the best way to not be correct.
      2. Project estimates in e.g. software development are basically never correct because they are made with false assumptions (e.g. fungible capabilities between engineers, full focus on the topic) not seldomly because high ups don't allow for reality in those assumptions.

        Many modern building projects suffer a similar fate, but mostly because contractors cut corners without significant enough repercussions. In countries (e.g. China) where there is stronger enforcement, that ability to execute hasn't eroded as strongly.

        Humans are good in estimates (at a certain granularity we are almost concretely able to calculate how long something will take), but our social/economical/legal systems often leave a lot of room for error on the execution side.

        Replies (2)
        1. > Many modern building projects suffer a similar fate, but mostly because contractors cut corners without significant enough repercussions. In countries (e.g. China) where there is stronger enforcement, that ability to execute hasn't eroded as strongly.

          I disagree with that take.

          Big construction projects get derailed because the state or whoever pays for it wants it delivered on a tight budget that is most likely impractical and on a quick deadline as well. The bidders know this and account for it when they place their bids but everyone acts as if these delays are unexpected.

          The problem is that if bidders were giving their real timelines and the real costs upfront, then no projects would be approved unless it was matter of emergency or something like that.

          In France at the moment for example, they closed one of the major highways around Paris in order to fix a tunnel that has cracks in it and this closure is supposed to last 10 months.

          I made a bet with a friend who works in construction that the closure will last at least a year if not 18 months. Why? Because the 10 months timeline is the most optimistic one and is simply not realistic but if the real timeline had been given from the start, the whole thing would have been canceled so lying is necessary just to get things done.

        2. So, there is no true Scotsman?
    2. > our error bars are usually narrow

      I don't know where you work but I have never seen that anywhere. 200% overrun is expected, 400% still quite common and 1000% is not unheard of either. Time as well as money.

      Tech, pharmaceuticals, public infra. My sample is pretty broad.

      Replies (1)
      1. This has also been my experience. However, even if it will take 10x the amount of time and compute to break public-key cryptography than it took to solve the Riemann conjecture, we are still expecting it to happen in the near future.
        Replies (1)
        1. The Riemann Hypothesis is about 170 years old. I'd not start to sweat if 10x is what we are looking at.
          Replies (1)
          1. If we look at the rate of progress in providing a solution for the Riemann hypothesis, its dependency on modern compute (the availability of which continues to increase exponentially) is the key factor here.
    3. > Humans are pretty good at that, and our error bars are usually narrow (in the grand scheme of things).

      No. There are studies upon studies upon studies that show that people are overconfident to the extreme in the face of unknowns. We consistently underestimate just how bad we are at this. Even the people who know how bad they are at this usually don't perform much better in controlled experiments.

    4. > ... project managers estimating the relative difficulty between two products ... Humans are pretty good at that...

      If the last 25-30 years of software industry is an indicator, humans are absolutely terrible at estimating timelines.

      Replies (1)
    5. >Humans are pretty good at that, and our error bars are usually narrow (in the grand scheme of things).

      We're actually really lousy at it. We've seen how many attempts at a new air traffic control system here in the US in our lifetime? 3 now?

      The difference between ATC and the shitty little software products we work on for our employer is that if ours goes horribly overbudget or past the deadline, the company just gives up for goes insolvent, and we go to work for a new one, and it never makes much of a headline.

    6. My brother in christ, scientific discoveries are not analogous to the manufacturing of consumer widgets.